STEMWALL FOOTER DETAIL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


NOTES

 

  1. Bottom of footer must be at least 12” below finished grade.
  2. 5/8” rebar in footer must be cold bent (not heated) around each corner and splices must lap a minimum of 25 inches.
  3. Bend vertical steel into footer a minimum of 10 inches.
  4. Bend vertical steel into slab a minimum distance of 16 inches.
  5. Anchor bolts must be a minimum size of 5/8” and embed at least 7” in concrete.
  6. Maximum spacing of anchor bolts 32 inches on center.
  7. 3-inch washer required for anchor bolts.
  8. If a bond beam is provided with 1-#5 rebar, only cells with vertical steel need be poured solid.